2007 Goulburn Broken Project
project:
2007 Goulburn Broken Project
This photography was captured for the Moira Shire as part of the 2007 Goulburn Broken Project under the 2006-7 CIP Program.
The photography was digitally acquired using a Zeiss DMC camera and includes 3 visible bands. The imagery has been fully orthorectified
and tiled into 1km tiles. It is available in both TIFF and ECW compressed format.
|
|
Citation proposal Citation proposal
(2007) 2007 Goulburn Broken Project Department of Transport and Planning https://metashare.maps.vic.gov.au/geonetwork/srv/eng/catalog.search#/metadata/054b3c0c-445f-5785-8937-61bf5c055981 |
- Description
- Temporal
- Spatial
- Maintenance
- Format
- Contacts
- Keywords
- Resource Constraints
- Lineage
- Metadata Constraints Metadata Constraints
- Quality
- Acquisition Info
- Raster Data Details
- Raster Type Details
- Point Cloud Data Details
- Contour Data Details
- Survey Details
Description
- Title
- 2007 Goulburn Broken Project
- Alternate title
- 2007 Goulburn Broken Project
- Purpose
- Flood Mapping, Planning, Conceptual Design
Temporal
- Time period
- 20062007
Contacts
Point of contact
Department of Transport and Planning
-
Coordinated Imagery Program
PO Box 500
East Melbourne
Victoria
3002
Australia
Cited responsible party
No information provided.
Cited responsible party
No information provided.
Keywords
- Topic category
-
- Imagery base maps earth cover
Resource Constraints
- Use limitation
- General
- Classification
- Unclassified
Metadata Constraints Metadata Constraints
- Classification
- Unclassified
Quality
Attribute Quality
Positional Accuracy
Conceptual Consistency
Missing Data
Excess Data
Provided by