2017-19 Rivers Audit Project - Goulburn Broken CMA
project:
cep06-2017-18_rivers_LiDAR_GBCMA
The 2017-19 River condition audit project has been undertaken to supplement and compare mapping undertaken in DELWPs 2009-10 Index of Stream Condition (ISC) assessment.
The Department of Environment, Land, Water, Planning (DELWP) has developed a methodology to assess aspects of river condition using remote sensing data, specifically LIDAR and aerial photography. This project collects LiDAR and imagery for a subset of rivers mapped in the original 2009-10 ISC survey. In addition to supporting the generation of physical form and ripartian vegetation metrics, the data has been used to identify change over time. LiDAR and imagery was captured for 70 rivers across nine CMAs over two seasons (2017-18 and 2018-19).
Goulburn Broken CMA rivers were captured in the first season, so the data is from 2017-18.
Remote sensing data collected includes LiDAR data at four points per m² and 12.5cm aerial photography. These were used to derive a range of standard and non-standard physical form and riparian vegetation raster datasets. The project was managed on a CMA by CMA basis with all source and derived datasets being organised this way.
|
Citation proposal Citation proposal
(2019) 2017-19 Rivers Audit Project - Goulburn Broken CMA Department of Transport and Planning https://metashare.maps.vic.gov.au/geonetwork/srv/eng/catalog.search#/metadata/2cd9a7a9-6dcc-56bd-b0d4-a756cc88fa65 |
Details
Contacts
Cited responsible party
No information provided.
Cited responsible party
No information provided.
Point of contact
Department of Transport and Planning
-
Coordinated Imagery Program
PO Box 500
East Melbourne
Victoria
3002
Australia
Identifiers and Keywords
- Topic category
-
- Imagery base maps earth cover
Resource Constraints
- Use limitation
- General
- Classification
- Unclassified
Other Dataset Details
- Date ( Revision )
- 2019-07-08
- Purpose
- To map and assess condition and change in physical form and riparian vegetation at selected rivers by comparing LiDAR and imagery captured in 2017-18 against baseline 2009-10 data
Spatial
- Spatial representation type
- Grid
- Description
- Eight rivers within Goulburn Broken Catchment Management Area; a 200m buffer either side of river centreline was used as the AOI for each river, with overflown data also retained as part of each dataset. LiDAR, DTM and imagery products are cropped to the same extent for each river. Acheron River, Broken River, Faithfulls Creek, Goulburn River, Holland Creek, Hughes Creek, King Parrot Creek, Seven Creeks
Acquisition Date
- Begin date
- 2017
- End date
- 2018
Project Acquisition Data
- Status
- complete
- Program
- 2017-19 Statewide Rivers Audit LiDAR
- Contract Number
- 336742
- Schedule Number
- 06-2017-18
Cited responsible party
No information provided.
- Method
- Captured
About the Metadata Record
- Metadata identifier
- 2cd9a7a9-6dcc-56bd-b0d4-a756cc88fa65
Contact
No information provided.
Contact
No information provided.
- Resource Type
- Project
- Date info ( Revision )
- 2019-07-08
- Standard Name
- ISO 19115-3:2018
- Profile Name
- DELWP Profile
- Profile Version
- Version 1
- Profile Date
- 2019-05-24
Metadata Constraints
- Classification
- Unclassified
Overviews
Provided by
Views Views
2cd9a7a9-6dcc-56bd-b0d4-a756cc88fa65
Access to the portal Access to the portal
Read here the full details and access to the data. Read here the full details and access to the data.
Associated resources
Not available