delatite_2021dec21_air_vis_10cm_epsg7855
dataset
Dataset: delatite_2021dec21_air_vis_10cm_epsg7855
Assembly: Mosaic
|
Citation proposal Citation proposal
delatite_2021dec21_air_vis_10cm_epsg7855 Department of Transport and Planning https://metashare.maps.vic.gov.au/geonetwork/srv/eng/catalog.search#/metadata/afc35e1a-ff5a-5099-af19-04af39724897 |
Details
Contacts
Point of contact
Department of Transport and Planning
-
Coordinated Imagery Program
PO Box 500
East Melbourne
Victoria
3002
Australia
Identifiers and Keywords
- ANZLIC Id
- ANZVI0008106325
- Topic category
-
- Elevation
Resource Constraints
- Use limitation
- General
- Classification
- Unclassified
Other Dataset Details
- Format
- ECW,TIFF
Spatial
- Spatial representation type
- Grid
- Reference system identifier
- MGA Zone 55 GDA2020
Resolution
- Horizontal Accuracy
- 0.2m
- Row Resolution
- 10cm
- Column Resolution
- 10cm
Quality
- Conceptual Consistency
- 3 band photography meets expected band naming and combination specifications.
- Missing Data
- Project area has 100% coverage
Lineage
- Description
- A3 Digital Mapping Camera System: Dual CCDs. Two 300mm lenses. Fast compression and storage unit. Dual frequency GPS. Weight 38 kilograms. Dimensions 50cm x 60cm x 60 cm. Frames are exposed in a cross-track direction, providing a FOV of up to 106 degrees. High resolution vertical and oblique images are captured simultaneously. A3 LightSpeed Processing System: PC server. A3 LightSpeed Software. The system solves the Aerial Triangulation and bundle adjustment automatically. Manual geo-referencing may be carried out. Automatic processing of DSM, DTM and orthophoto. A3 Image Processing Workflow: Flight planning. Aerial image acquisition. Download imagery and metadata from the storage unit onto the processing system. Inspection of captured imagery. Combine and index the imagery with post-processed GPS. Aerial triangulation and adjustment to ground control. Preparation of a DTM. Editing or validation of the DTM. Orthophoto creation. Image Tiling. Colour profiling. Quality Assurance. Editing of imagery to produce a homogeneous product.
Text
No information provided.
Acquisition Date
- Begin date
- 2021-12-21
- End date
- 2021-12-21
Instrument
- Name
- VisionMap A3 - Edge
- Type
- Digital Photo
- Platform Type
- Aerial
Acquisition Data (Common)
- Status
- complete
- Assembly
- Mosaic
- Tile Size
- 1 km
Raster Details
- Number of Bands
- 3
- Band List
- 1,2,3
- Resampling Kernel
- Not Entered
- Platform Name
- Fixed Wing Aircraft
- Seamlessness
- Full
- Rectification Type
- Orthorectified
Aerial Photo Details
- Photo Type
- Digital
- Lens
- Not Entered
Aerial Survey Details
- Runs
- 8
- Run Orientation
- N-S
- Flying Height Unit
- Not Entered
About the Metadata Record
- Metadata identifier
- afc35e1a-ff5a-5099-af19-04af39724897
Contact
No information provided.
- Resource Type
- Dataset
- Date info ( Revision )
- 2023-03-22T00:22:23
- Standard Name
- ISO 19115-3:2018
- Profile Name
- DELWP Profile
- Profile Version
- Version 1
- Profile Date
- 2019-05-24
Metadata Constraints
- Classification
- Unclassified
Overviews
Provided by
Views Views
afc35e1a-ff5a-5099-af19-04af39724897
Access to the portal Access to the portal
Read here the full details and access to the data. Read here the full details and access to the data.
Associated resources
Not available