bearii_2020nov17
dataset
Dataset: bearii_2020nov17
Assembly: Mosaic
|
Citation proposal Citation proposal
bearii_2020nov17 Department of Transport and Planning https://metashare.maps.vic.gov.au/geonetwork/srv/eng/catalog.search#/metadata/c32effee-60a1-5fb3-bdab-5300e21df9a1 |
- Description
- Temporal
- Spatial
- Maintenance
- Format
- Contacts
- Keywords
- Resource Constraints
- Lineage
- Metadata Constraints
- Quality
- Acquisition Info
- Raster Data Details
- Raster Type Details
- Point Cloud Data Details
- Contour Data Details
- Survey Details
Simple
Description
- Title
- bearii_2020nov17
Temporal
- Time period
- 2020-11-172020-11-17
Spatial
- Horizontal Accuracy
- 0.2m
- Code
- MGA Zone 55 GDA2020
Maintenance
Format
- Title
- ECW,TIFF
Contacts
Point of contact
Department of Transport and Planning
-
Coordinated Imagery Program
PO Box 500
East Melbourne
Victoria
3002
Australia
Keywords
- Topic category
-
- Imagery base maps earth cover
Resource Constraints
- Use limitation
- General
- Classification
- Unclassified
Lineage
- Description
- Aerial Triangulation -Initial EO configuration based on boresight-corrected airborne GPS-IMU data from the airborne GPS-IMU unit post-processed in Novatel Inertial Explorer using the nearest ARGN CORS station. -Initial EO error residual estimates were input based on the quality of the GPS-IMU solution output from Novatel Inertial Explorer. -Validation of differential GPS-IMU solution using nearest ARGN CORS station data by comparison with Inertial Explorer's precise-point-positioning (PPP) solution that utilises precise satellite orbit and clock information. -Confirmation that initial EO error residual estimates are valid. -Automated tie point matching with interactive filtering based on maximum parallax, minimum correlation and maximum search window. -Manual refinement of block adjustment with manual tie point review and exclusion. -Final block adjustment with any GCPs included as control and visual review of final solution. Orthophoto Production -Bi-directional Reflectance Distribution Function (BRDF) algorithm on a flightline by flightline basis prior to orthophoto production. -Stereoscopically derived DEM (typically at 4 times image resolution) for orthophoto processing after a review of the completeness and accuracy of the generated DEM. -Individual orthophotos were generated with the (minimum) outer 10% of the image removed. -Photomod Geomosaic for the production of a seamless orthophoto mosaic from the individual orthophotos. -Colour and contrast balance across the mosaic.
Metadata Constraints
- Classification
- Unclassified
Quality
Attribute Quality
Positional Accuracy
Conceptual Consistency
- Comments
- 3 band imagery meets expected band naming and combination expectations
Missing Data
- Comments
- Imagery is complete for specified township area.
Excess Data
Acquisition Info
- Platform Type
- Aerial
- Assembly
- Mosaic
- Tile Size
- 1 km
Raster Data Details
- Raster Type
- Aerial Photo
- X Pixel Resolution (cm)
- 10cm
- Y Pixel Resolution (cm)
- 10cm
- Seamlessness
- Full
- Number of Bands
- 3
- Band List
- 1,2,3
- Resampling Kernel
- Unknown
- Rectification Type
- Orthorectified
- Platform Name
- Fixed Wing Aircraft
Point Cloud Data Details
Contour Data Details
Survey Details
Sensor
- Title
- PhaseOne iXA
- Identifier
- Aerial
- Type
- Digital Photo
Aerial Survey Details
- Runs
- 5
- Run Orientation
- E-W
- Side Overlap
- 40
- Forward Overlap
- 70
- Flying Height Unit
- agl feet
- Flight Height
- 5000
Overviews
Provided by
Views Views
c32effee-60a1-5fb3-bdab-5300e21df9a1
Access to the portal Access to the portal
Read here the full details and access to the data. Read here the full details and access to the data.
Associated resources
Not available